There may be local zoning or deed restrictions pertaining to height and type of fence.
Commercial chain link fence installation instructions.
For example a 4 high chain link fence requires three tension bands per hook up.
Chain link fence installation manual before you begin.
You ll want to dig your terminal posts first and then install your line posts.
Mark the fence location.
Mark the places for terminal posts place a stake at.
Find and download specifications and drawings for all of ameristar s products.
Check out your property line setback requirements.
Slide a tension bar through the first row of chain link diamonds.
Step 4 place one brace band on first to use if bottom tension wire will be installed.
Measure the length measure the boundary of the space you want to enclose to determine how much fencing fabric and top.
Obtain necessary zoning and building permits.
The bands will help hold the mesh in place once it s installed.
Use a rubber mallet to drive end post caps onto the gate corner and end.
Starting at a terminal post unroll chain link fabric on the ground along the outside of the fence line to the next terminal post.
This fitting requires one 5 16 x 1 1 4 standard fence bolt and nut.
With the end of the spool firmly in your grasp slowly pull the wire along the inside of the fence line to the other.
Lay it on the ground and cut the banding.
Corner posts have two hook ups.
The ears of the band pointed to the.
Locate the spool at the far end of the stretch.
All posts should be set about 4 inches inside the line.
Find your boundary lines your fence posts should be at least 4 inside of the lines or the footings may go over into the.
11 steps of chain link fence installation step 1.
Step 3 a hook up is each connection of chain link to an end or corner post.
To install a chain link fence start by establishing your property lines and placing your post holes 4 inches inside those lines.
Slide tension bands onto each corner gate and end post.
Next measure the total length of the fence and mark where each terminal post will go.
Install an end band at the base of the terminal post.
Put hinges and latch hardware onto the gate posts at roughly their final positions to install later.
Check all the regulations about fence setbacks type and height.